Structural Engineering Geotechnical Engineering Hydraulic Engineering About BAW Press Careers

Press Images


small thumbnail-picturesmedium-sized thumbnail-pictures selectedlarge thumbnail-pictures25 pictures found. (this page: picture 1 to 25)

BAW - competence for waterways
BAW - competence for w...
Pilot station ship ELBE
Pilot station ship ELBE
Major lock repair project
Major lock repair project
Lock at the Neckar
Lock at the Neckar
The BAW's Director Prof. Dr.-Ing. Christoph Heinzelmann
The BAW's Director Pro...
Lighthouse during a storm tide
Lighthouse during a st...
Weir model for tests in the field of waterways engineering
Weir model for tests i...
Model of the new ship lift in Niederfinow
Model of the new ship ...
Model of a river with a shifting bed
Model of a river with ...
Model test
Model test
Space required by a pushed barge train following a bend in the waterway
Space required by a pu...
Container ship on River Elbe
Container ship on Rive...
Rerouting of the Spree during the building of the Berlin Main Railway
Rerouting of the Spree...
Construction site in Bolzum
Construction site in B...
Fish migrating facility
Fish migrating facility
Model of power plant tailwater at Lauffen with entrance structure to the upstream fish ladder - flooded
Model of power plant t...
Construction of a revetment
Construction of a reve...
Barrage of the Moselle river in Grevenmacher
Barrage of the Moselle...
3D Visualization
3D Visualization
Ship handling simulator in BAW
Ship handling simulato...
High-performance computer SGI_ICE
High-performance compu...
BAW Karlsruhe
BAW Karlsruhe
BAW Hamburg
BAW Hamburg
Girls' Day
Girls' Day
The BAW daycare center
The BAW daycare center